Your cart is empty.
Browse the store →
CCI Vietnam, a global electrical components manufacturer, installed 12 Vulcan units across their factory. Results: eliminated scale inhibitor chemicals, extended chiller cleaning from 3 to 8+ months.
CCI Vietnam Co., Ltd, located in Nui Thanh, Quang Nam, Vietnam, is a global multinational company that produces electrical components.
Chiller required cleaning every 3 months due to limescale buildup
Scale accumulation at cooling tower and condenser tubes
Reliance on scale inhibitor chemicals

CCI Vietnam installed a comprehensive Vulcan system across their facilities to address scale problems without chemicals.
Vulcan S250
2 (Factory CCIPY) + 1 (Factory CCI)
Vulcan S150
Factory CCI VN
Vulcan S25
Factory CCI VN
Total: 12 Vulcan Units | 3 Different Models
CCI Vietnam does not utilise scale inhibitor chemicals. As a result, the chiller must be cleaned on a quarterly basis.
The Test: We installed a Vulcan S150 for one chiller system eight months after that, and compared it to other similar systems.
Result: Extended cleaning interval confirmed
CCI Vietnam utilises a scale inhibitor chemical. In response, we proceeded with the installation of the Vulcan S250.
The Result: Effectively eliminated the need for scale inhibitor chemicals, while maintaining the use of 50% biocide chemicals.
Comparison: This approach has been compared with another system over a period of 15 months, with similar outcomes observed.

Limescale deposits after 3 months without the use of Vulcan
Chiller required cleaning every 3 months

Clean results after 8 months with the use of Vulcan
Chiller cleaning interval extended significantly

Vulcan S25 installation

Vulcan S150 installation

Pipe isolated after S150 installation

Pipe isolated after S150 installation

Vulcan S25 installation

Vulcan S150 installation
Chiller cleaning interval (months)
Scale inhibitor chemicals eliminated
Vulcan units installed
Model | Quantity | Max Pipe Diameter | Max Flow Rate | Application |
|---|---|---|---|---|
Vulcan S250 | 3 | 10 inches | 1,540 GPM | Large chiller systems, main cooling |
Vulcan S150 | 3 | 8 inches | 790 GPM | Medium chiller systems, cooling towers |
Vulcan S25 | 6 | 4 inches | 130 GPM | Smaller lines, auxiliary equipment |
All models feature zero maintenance and work on all pipe materials.
CCI Vietnam demonstrates that large-scale industrial facilities can eliminate chemical scale inhibitors with Vulcan. Twelve units across three models extended chiller cleaning intervals from 3 to 8+ months while maintaining performance.
Join global manufacturers like CCI Vietnam in choosing chemical-free, maintenance-free scale prevention with Vulcan.
Waslix provides non-chemical, maintenance-free scale prevention using Vulcan technology. This case study documents 12 Vulcan units (3x S250, 3x S150, 6x S25) protecting the CCI Vietnam electrical components factory in Quang Nam, Vietnam.

Waslix gathers, organizes, and researches a massive range of products across water, light, air, and energy. We demystify complex technologies to simplify your high-involvement purchasing decisions, making complete solutions easily accessible.
Edit this HTML block.