Your cart is empty.
Browse the store →
After 1 month we have been able to tell there is a 50% improvement in nozzle and branch pipe blockage.
Model: Vulcan S25
Location: China
Installation Area: water inlet pipe
The Foshan Brick Factory installed a Vulcan S25 on the inlet water pipe and after 1 month they observed a 50% improvement in nozzles and branch pipes. The inlet water temperature is now 49.5 °C and the spray reaction temperature has decreased to 120-140 °C. Installing the mineral descaler has improved energy efficiency.


The FGD plant before the Vulcan descaler was installed

AFTER 25 days the Vulcan Descaler has already greatly improved our scaling situation

Waslix gathers, organizes, and researches a massive range of products across water, light, air, and energy. We demystify complex technologies to simplify your high-involvement purchasing decisions, making complete solutions easily accessible.
Edit this HTML block.