Your Cart

Your cart is empty.

Browse the store →

Sea Link Die Casting (Kunshan)

Sea Link Die Casting

The cooling tower were heavily scaled and the build-up was difficult to remove. This resulted in poor heat transfer efficiency and a high rate of product manufacturing defects. The cooling tower system required manual cleaning 4-6 times a year. 6 months after installing the Vulcan S100 no new scale had formed in the cooling system

Model: Vulcan S100 
Installation Area: Cooling system water line

sealink remove mineral scale cooling tower descaler

Project facts

Country
China
Industry
Manufacturing
Equipment
Cooling System, Cooling Tower
Environment
Commercial
Vulcan models used
Vulcan S100
Installation area
Cooling system water line

Waslix gathers, organizes, and researches a massive range of products across water, light, air, and energy. We demystify complex technologies to simplify your high-involvement purchasing decisions, making complete solutions easily accessible.

Edit this HTML block.

Stay in the loop

We respect your privacy. Unsubscribe anytime.