Your Cart

Your cart is empty.

Browse the store →

Taikang Financial Tower

There are 4 heat exchanger systems in the building, which have to be treated. For the business purpose, the hot water supply can not be interrupted. 4 sets of Vulcan S10 were installed to gently clean the heat exchangers and the whole piping system without stopping the machines.

Model: Vulcan S10 
Location: Beijing (China)
Installation Area: water inlet of the heat exchangers

About Taikang Financial Tower:

The construction was completed in 2007, located in the central area of Beijing. The total number of floors: 20 floors above ground and 3 floors underground.

Taikang Financial Tower vulcan protects heat exchangers 1

The black tanks are heat exchanger systems. The heat exchangers have been running for a long time, thus, the efficiency has been reduced because of limescale. Therefore, 3 sets of Vulcan S10 were installed at the water inlet of each heat exchanger.

Taikang Financial Tower vulcan protects heat exchangers 2

Another Vulcan S10 was also installed at the water inlet of the heat exchanger. The advantage of Vulcan: no chemical, no need to stop hot water supply.

Project facts

Country
China
Location
Beijing (China)
Equipment
Heat Exchanger
Environment
Commercial
Vulcan models used
Vulcan S10
Installation area
water inlet of the heat exchangers

Waslix gathers, organizes, and researches a massive range of products across water, light, air, and energy. We demystify complex technologies to simplify your high-involvement purchasing decisions, making complete solutions easily accessible.

Edit this HTML block.

Stay in the loop

We respect your privacy. Unsubscribe anytime.