Your cart is empty.
Browse the store →
Shanxi Jinshen Shaping Coal Industry Company, and its main business is coal mining sales.
Model:
Vulcan S25: On the canteen's main pipeline to solve the scaling problems.
Vulcan S25: On the main water pipe in the boiler room. Directly after where the Vulcan S25 is installed, there are 2 branch pipes. One pipe goes to the soften water process for the steam boiler and the heating system. Another branch pipe goes to the heat exchanger for the bathing water. Vulcan was installed to solve the serious scaling problems of the heat exchanger
Vulcan S150: On the main water pipe for the office building and the dormitory to prevent the scaling problems.
Location: Jincheng (China)
Installation Area: various locations

Vulcan S150 was installed on the main water pipe for the office building and the dormitory

Vulcan S25 was installed on the main water pipe in the boiler room

Vulcan S25 was installed to solve the scaling problems for the canteen

Waslix gathers, organizes, and researches a massive range of products across water, light, air, and energy. We demystify complex technologies to simplify your high-involvement purchasing decisions, making complete solutions easily accessible.
Edit this HTML block.